Representatives from the lender’s group (consisting of 10 major banks and financial institutions in Thailand) visited AIT’s WEM Hydraulics Laboratory to witness the model presentation and demonstration of the Luang Prabang Hydroelectric Power Project in Laos PDR (LPHPP) on July 5, 2022.
The physical hydraulic model study of LPHPP is being carried out at WEM Hydraulics Laboratory to investigate the hydraulic conditions at various phases during the project construction as well as to verify the hydraulic functioning of the main hydraulic structures during its operation.